100 Dover St
Drag to compare the lot in 2019 with 2026. The pink line is the surveyed parcel boundary.
Where it stands
Last city record Jan 29, 2026The numbers
From deeds, the permit and the parcel roll- Lot purchase
- $95K Mar 2020
- Lot size
- 5,929 sf 0.14 acres
- Declared permit value
- $384K as declared; real cost runs well higher
- Home size
- ~1,900 sf under air from the permit’s plans
- Plan
- Not in the permit
- Flood zone
- X
- Waterfront
- No
- Ownership
- Company-owned lot likely a custom home
Against the market
Boca Raton · since 202172.8 months since the permit. A typical home off the water in Boca Raton takes 22.8; the middle half take 19.5–26.3.
- This home
Middle half, Boca Raton off the water
178 homes off the water in Boca Raton permitted 2021–2023, from the permit application to the certificate-of-occupancy packet.
- Median
Construction log
25 city records- Finishes: final survey filedFinal Survey/Elevation Certificate · Disapproved
- Foundation: termite pre-treatment certifiedTermite Certificate · Passed
- Finishes: insulation certifiedInsulation Certificate · Passed
- Energy Compliance Check InspectionPassed
- Building Elevation SurveyDisapproved
- Exterior Lathing InspectionPassed
- Drywall InspectionPassed
- Finishes: insulation certifiedInsulation Inspection · Passed
- Framing InspectionRe-inspection required
- Roof Field FinalPassed
- Roof Covering In Progress InspectionPassed
- Window/Door Bucks InspectionRe-inspection required
- Wall Dry-in InspectionPassed
- Secondary Water Barrier InspectionRe-inspection required
- Roof Tin Cap InspectionRe-inspection required
- Wall Sheathing InspectionPassed
- Roof: truss drawings filedTruss Engineering Inspection · Re-inspection required
- Roof Sheathing InspectionPassed
- Tie Beam InspectionPassed
- Columns InspectionPassed
- Foundation: termite pre-treatment certifiedTermite Slab Pretreat Inspection · Passed
- Footing InspectionPassed
- Dock or seawall permitSlab (Building, Dock) Inspection · Disapproved
- New-home permit issuedNew-Home Permit Issued · Issued
- New-home permit filedResidential New Construction Permit · Issued
Permit 20_00008714 on Boca eHub: “new sfr”