What does it cost to build a house in Pompano Beach in 2026?

As of October 2026, building a new house in Pompano Beach costs an estimated $215 to $325 per square foot before the lot, depending on how high-end the house is. On their permits, builders declare a median $73 per square foot. That’s the figure they give the city, and it usually runs well below the real cost.

$215–325estimated build cost per sq ft, the typical new house inland and on the water, before the lot
$73declared per sq ft on new-home permits (median of 146 finished houses)
$980Kmedian lot bought for a new home on the water in the past two years ($120K inland)
$882median sale per sq ft of a new house on the water ($212 inland)
The lot, and the finished price

What land costs, and what new homes sell for.

Since November 2024, lots bought for new homes went for a median $980K on the water and $120K inland. Land sold for a median $150 a square foot on the water and $106 inland. Finished new houses have sold for a median $882 a square foot on the water and $212 inland.

Lots and land →

Lots bought for new homes

Since November 2024
On the water5 lots, a median 7,000 sq ftMiddle half $725K to $2.23M.
$980K
Inland7 lots, a median 6,530 sq ftMiddle half $95K to $164K.
$120K
  • Middle half in Pompano Beach
  • Median

New houses sold

$ per sq ft
On the water7 salesMiddle half $861 to $1,220 a square foot.
$882
Inland146 salesMiddle half $185 to $278 a square foot.
$212
  • Middle half in Pompano Beach
  • Median

Every lot is priced differently: see what builders paid nearby with a lot report for any address, or browse every vacant lot.

A worked example

Two new houses, priced out.

The typical new house on each side of the water, priced with the calculator’s own starting numbers. These are estimates, not quotes: a builder’s bid should replace the build cost.

A new house inland

1,900 sq ft · Builder grade
Lot $120KBuild $409KSoft costs $41K
Lot
$120KThe median lot bought for a new home inland since November 2024 (7 lots, a median 6,530 sq ft).
Build
$409K1,900 sq ft, the median new house inland on the tax roll, at $215 a sq ft: the calculator’s Builder grade tier, for homes that sell for about $212 a sq ft inland.
Soft costs
$41K10% of the build, the calculator’s default: design, engineering, permits and insurance.
Estimated total, before financing$569KFor scale: at $212 a sq ft, a new house that size inland would sell for about $403K.

A new house on the water

5,700 sq ft · Luxury
Lot $980KBuild $1.85MSoft costs $185K
Lot
$980KThe median lot bought for a new home on the water since November 2024 (5 lots, a median 7,000 sq ft).
Build
$1.85M5,700 sq ft, the median new house on the water on the tax roll, at $325 a sq ft: the calculator’s Luxury tier, for homes that sell for about $882 a sq ft on the water.
Soft costs
$185K10% of the build, the calculator’s default: design, engineering, permits and insurance.
Estimated total, before financing$3.02MFor scale: at $882 a sq ft, a new house that size on the water would sell for about $5.03M.

Run it with your own numbers: open a lot report for any address. Its calculator starts from the land sales and new-home prices around that lot. The calculator also counts interest over the build, which takes a median 19.7 months from permit to certificate of occupancy (37.5 on the water).

How long it takes

A median 19.7 months from permit to certificate of occupancy in Pompano Beach, stage by stage and builder by builder: how long it takes to build.

Pick a builder

Compare every builder on build time, waterfront work and sales, or match builders to where you want to build.

How the numbers work

Where the calculator’s build costs come from, and how they’re tested against recorded sales: the lot calculator.

Declared values are from new-home permits on Pompano Beach Click2Gov; lot and sale prices from recorded deeds on the county parcel roll; square feet are the tax roll’s total building area. Build costs, totals and resale figures are Groundbreak’s estimates, not quotes or appraisals. Figures as of October 2026. How the data works.