Last city record Sep 21, 2023
CompletedSep 2023

The numbers

From deeds, the permit and the parcel roll
Lot purchase
Not recorded
Lot size
13,961 sf 0.32 acres
Declared permit value
$488K as declared; real cost runs well higher
Home size
8,138 sf on the tax roll
Plan
Not in the permit
Flood zone
X
Waterfront
No
Ownership
Private owner likely a custom home

Against the market

Boca Raton · since 2021
Build time, months from permit
0 mo30 mo60 mo

Built in 26.3 months, 3.5 months slower than typical (22.8 months for homes off the water in Boca Raton).

  • This home
  • Middle half, Boca Raton off the water

    178 homes off the water in Boca Raton permitted 2021–2023, from the permit application to the certificate-of-occupancy packet.

  • Median
How we calculate this

Construction log

26 city records
  1. Building Field FinalPassed
  2. Finishes: final survey filedFinal Survey/Elevation Certificate · Passed
  3. Energy Compliance Check InspectionPassed
  4. Foundation: termite pre-treatment certifiedTermite Certificate · Re-inspection required
  5. Finishes: insulation certifiedInsulation Certificate · Passed
  6. Roof Field FinalPassed
  7. Roof Covering In Progress InspectionPassed
  8. Finishes: insulation certifiedInsulation Inspection · Passed
  9. Drywall InspectionRe-inspection required
  10. Framing InspectionDisapproved
  11. Exterior Lathing InspectionPassed
  12. Window/Door Bucks InspectionDisapproved
  13. Wall Dry-in InspectionPassed
  14. Roof Mop in Progress InspectionPassed
  15. Roof Tin Cap InspectionPassed
  16. Wall Sheathing InspectionPassed
  17. Roof: truss drawings filedTruss Engineering Inspection · Partial Pass
  18. Floor Sheathing InspectionPassed
  19. Roof Sheathing InspectionDisapproved
  20. Columns InspectionPassed
  21. Tie Beam InspectionPartial Pass
  22. Building Elevation SurveyPassed
  23. Foundation: termite pre-treatment certifiedTermite Slab Pretreat Inspection · Passed
  24. Dock or seawall permitSlab (Building, Dock) Inspection · Passed
  25. Building Form Board SurveyPassed
  26. New-home permit filedResidential New Construction Permit · Complete

Permit 21_00006958 on Boca eHub: “new sfr”