Last city record Jan 8, 2024
Sold$2.31M · Feb 2024$356 per sq ft

The numbers

From deeds, the permit and the parcel roll
Lot purchase
Not recorded
Lot size
12,602 sf 0.29 acres
Declared permit value
$389K as declared; real cost runs well higher
Home size
6,487 sf on the tax roll
Plan
Not in the permit
Flood zone
X
Waterfront
No
Ownership
Private owner likely spec: the owner on the permit has sold 19 other new homes

Against the market

Boca Raton · since 2021
Build time, months from permit
0 mo30 mo60 mo

Built in 29.9 months, 7.1 months slower than typical (22.8 months for homes off the water in Boca Raton).

  • This home
  • Middle half, Boca Raton off the water

    178 homes off the water in Boca Raton permitted 2021–2023, from the permit application to the certificate-of-occupancy packet.

  • Median
How we calculate this

Construction log

27 city records
  1. Building Field FinalPassed
  2. Finishes: final survey filedFinal Survey/Elevation Certificate · Passed
  3. Energy Compliance Check InspectionPassed
  4. Foundation: termite pre-treatment certifiedTermite Certificate · Passed
  5. Finishes: insulation certifiedInsulation Certificate · Passed
  6. Roof Field FinalDisapproved
  7. Roof Covering In Progress InspectionPassed
  8. Drywall InspectionPassed
  9. Finishes: insulation certifiedInsulation Inspection · Passed
  10. Framing InspectionDisapproved
  11. Exterior Lathing InspectionPartial Pass
  12. Window/Door Bucks InspectionDisapproved
  13. Roof Mop in Progress InspectionPassed
  14. Roof Tin Cap InspectionPassed
  15. Wall Dry-in InspectionPassed
  16. Roof: truss drawings filedTruss Engineering Inspection · Passed
  17. Wall Sheathing InspectionPassed
  18. Roof Sheathing InspectionPassed
  19. Floor Sheathing InspectionPassed
  20. Columns InspectionPartial Pass
  21. Tie Beam InspectionDisapproved
  22. Building Elevation SurveyPassed
  23. Foundation: termite pre-treatment certifiedTermite Slab Pretreat Inspection · Passed
  24. Dock or seawall permitSlab (Building, Dock) Inspection · Passed
  25. Building Form Board SurveyPassed
  26. New-home permit issuedNew-Home Permit Issued · Issued
  27. New-home permit filedResidential New Construction Permit · Certificate Of Occupancy

Permit 21_00006961 on Boca eHub: “new sfr”