Complete

Complete: certificate-of-occupancy packet submitted, or on the tax roll as a built home

Likely spec

Likely spec: the owner has 2 other new homes permitted. Not confirmed by the builder.

2862 NW 4 Ct

2862 NW 4 Ct in January 20262862 NW 4 Ct in 20222022 · Broward County · Broward Co.2026 · Broward County · Broward Co.

Drag to compare the lot in 2022 with January 2026. The pink line is the surveyed parcel boundary.

Where it stands

Last city record May 6, 2025
CompletedJan 2025Sales on record through Jun 2026

The numbers

From deeds, the permit and the parcel roll
Lot purchase
$72K May 2023
Lot size
5,157 sf 0.12 acres
Declared permit value
$195K as declared; real cost runs well higher
Home size
1,530 sf on the tax roll
Plan
Not in the permit
Flood zone
X
Waterfront
No
Ownership
Company-owned lot likely spec: the owner has 2 other new homes permitted

Against the market

Pompano Beach · since 2021
Build time, months from permit
0 mo30 mo60 mo

Built in 18.2 months, about the typical pace (18.1 months for homes off the water in Pompano Beach).

Lot price vs. new-build lots in Collier City
$0$66K$131K

This lot cost $72K. The median new-build lot in Collier City went for $78K (11 lots).

  • This home
  • Middle half, Pompano Beach off the water

    144 homes off the water in Pompano Beach permitted 2021–2023, from the permit application to the certificate-of-occupancy packet.

  • Median
How we calculate this

Construction log

49 city records
  1. Fence/wall finalApproved
  2. Building finalApproved
  3. Mechanical roughApproved
  4. Mechanical miscellaneous roughApproved
  5. Final-mechanicalApproved
  6. Final-plumbingApproved
  7. Windows/doorsApproved
  8. Tin tagApproved
  9. Tile/shingle-in progressApproved
  10. Roofing finalApproved
  11. Miscellaneous finalApproved
  12. Fence/wall finalApproved
  13. Erosion control finalApproved
  14. Engineering sidewalk final(off-site)Approved
  15. Engineering paving concrete/final insp.Approved
  16. Electrical roughApproved
  17. Electrical final-electricApproved
  18. Blower door test - certificateApproved
  19. Final-plumbingApproved
  20. Engineering paving conc. form/steel inspApproved
  21. Plumbing lawn sprinklerApproved
  22. Electrical service roughApproved
  23. Zoning finalApproved
  24. Landscape shrub/sod/groundcoverApproved
  25. Landscape planting inspectionApproved
  26. Landscape irrigation wet testApproved
  27. Final landscapeApproved
  28. Electrical 30 day temporary powerApproved
  29. Plumbing final water meter & b/fCancelled
  30. Drywall-screw/nailApproved
  31. LathApproved
  32. Finishes: insulation certifiedInsulation-walls · Approved
  33. Finishes: insulation certifiedInsulation-ceilings · Approved
  34. FramingApproved
  35. Plumbing top outApproved
  36. Elevation surveyApproved
  37. Electrical roughApproved
  38. Window/door framingPartially approved
  39. Roof: truss drawings filedTruss · Approved
  40. Roof sheathingApproved
  41. Tie beamsApproved
  42. BeamsApproved
  43. Soil treatmentApproved
  44. Soil compactionApproved
  45. FootingsApproved
  46. Electrical foundation groundApproved
  47. Plumbing roughApproved
  48. New-home permit filedResidential New Construction Permit · CO issued
  49. New-home permit filedResidential New Construction Permit · Void

Permit 23-00006319 on Pompano Beach Click2Gov: “NEW SFR”