Complete
Complete: certificate-of-occupancy packet submitted, or on the tax roll as a built home
Custom
Custom: a company owns the lot, but nothing on record says it’s being built to sell.
581 Phillips Dr
Drag to compare the lot in 2021 with 2026. The pink line is the surveyed parcel boundary.
Where it stands
Last city record Sep 19, 2024The numbers
From deeds, the permit and the parcel roll- Lot purchase
- $1.79M Apr 2021
- Lot size
- 8,952 sf 0.21 acres
- Declared permit value
- $1.65M as declared; real cost runs well higher
- Home size
- 5,727 sf on the tax roll
- Plan
- Not in the permit
- Flood zone
- AE base flood elevation 7 ft
- Waterfront
- Yes parcel touches a mapped waterway
- Ownership
- Company-owned lot likely a custom home
Against the market
Boca Raton · since 2021Built in 31.9 months, 8 months slower than typical (23.9 months for waterfront homes in Boca Raton).
This lot cost $1.79M. The median new-build lot in Golden Harbour went for $3.2M (11 lots).
- This home
Middle half, Boca Raton waterfront
72 waterfront homes in Boca Raton permitted 2021–2023, from the permit application to the certificate-of-occupancy packet.
- Median
Construction log
28 city records- Dock or seawall permitBoatlift-Dock-Seawall-Pile Permit · Complete
- Building Field FinalDisapproved
- Finishes: final survey filedFinal Survey/Elevation Certificate · Disapproved
- Foundation: termite pre-treatment certifiedTermite Certificate · Passed
- Energy Compliance Check InspectionPassed
- Finishes: insulation certifiedInsulation Certificate · Passed
- Building Elevation SurveyPassed
- Dock or seawall permitBoatlift-Dock-Seawall-Pile Permit · Withdrawn
- Roof Final - W / UpliftPassed
- Roof Field FinalPassed
- Roof Covering In Progress InspectionPassed
- Drywall InspectionPassed
- Finishes: insulation certifiedInsulation Inspection · Passed
- Framing InspectionDisapproved
- Exterior Lathing InspectionDisapproved
- Window/Door Bucks InspectionPassed
- Roof Mop in Progress InspectionRe-inspection required
- Roof Sheathing InspectionPassed
- Roof: truss drawings filedTruss Engineering Inspection · Re-inspection required
- Tie Beam InspectionRe-inspection required
- Columns InspectionRe-inspection required
- Dock or seawall permitBoatlift-Dock-Seawall-Pile Permit · Complete
- Dock or seawall permitSlab (Building, Dock) Inspection · Passed
- Dock or seawall permitPiling(Building, Pool, Dock) Inspection · Passed
- Grade Beam InspectionPassed
- Foundation: termite pre-treatment certifiedTermite Slab Pretreat Inspection · Passed
- Building Form Board SurveyPassed
- New-home permit filedResidential New Construction Permit · Certificate Of Occupancy
Permit 22_00000647 on Boca eHub: “new sfr”