Sold

Sold: a recorded sale of the finished home

Likely spec

Likely spec: the owner on the permit has sold 43 other new homes. Not confirmed by the builder.

1430 NW 7 Way

Blanche Ely, Pompano BeachBuilder not on record
1430 NW 7 Way in January 20261430 NW 7 Way in 20202020 · City of Fort Lauderdale · Fort Lauderdale2026 · Broward County · Broward Co.

Drag to compare the lot in 2020 with January 2026. The pink line is the surveyed parcel boundary.

Where it stands

Last city record Jun 18, 2024
Sold$372K · Jul 2024$195 per sq ft

The numbers

From deeds, the permit and the parcel roll
Lot purchase
Part of a $1.57M purchase of 77 lots, Jan 2015
Lot size
2,793 sf 0.06 acres
Declared permit value
$231K as declared; real cost runs well higher
Home size
1,908 sf on the tax roll
Plan
Not in the permit
Flood zone
AH base flood elevation 11 ft
Waterfront
No
Ownership
Private owner likely spec: the owner on the permit has sold 43 other new homes

Against the market

Pompano Beach · since 2021
Build time, months from permit
0 mo30 mo60 mo

Built in 31 months, 12.9 months slower than typical (18.1 months for homes off the water in Pompano Beach).

  • This home
  • Middle half, Pompano Beach off the water

    144 homes off the water in Pompano Beach permitted 2021–2023, from the permit application to the certificate-of-occupancy packet.

  • Median
How we calculate this

Construction log

42 city records
  1. Final-plumbingApproved
  2. Fence/wall finalApproved
  3. Erosion control finalApproved
  4. Building finalApproved
  5. Zoning finalApproved
  6. Final-mechanicalApproved
  7. Final landscapeApproved
  8. Landscape irrigation wet testApproved
  9. Landscape shrub/sod/groundcoverApproved
  10. Landscape planting inspectionApproved
  11. Electrical final-electricApproved
  12. Final-plumbingApproved
  13. Windows/doorsApproved
  14. Miscellaneous finalApproved
  15. Engineering paving concrete/final insp.Approved
  16. Plumbing final water meter & b/fApproved
  17. Electrical 30 day temporary powerApproved
  18. Roofing finalApproved
  19. Drywall-screw/nailApproved
  20. Finishes: insulation certifiedInsulation-walls · Approved
  21. Finishes: insulation certifiedInsulation-ceilings · Approved
  22. FurringApproved
  23. FramingApproved
  24. Tile/shingle-in progressApproved
  25. Plumbing top outApproved
  26. Electrical roughApproved
  27. Roof: truss drawings filedTruss · Approved
  28. Electrical roughApproved
  29. Plumbing lawn sprinklerApproved
  30. Tin tagApproved
  31. Engineering paving conc. form/steel inspApproved
  32. Mechanical roughApproved
  33. LathApproved
  34. Roof sheathingApproved
  35. Tie beamsApproved
  36. Soil treatmentApproved
  37. Soil compactionApproved
  38. Slab/reinforcingApproved
  39. Plumbing roughApproved
  40. FootingsApproved
  41. Electrical foundation groundApproved
  42. New-home permit filedResidential New Construction Permit · CO issued

Permit 21-00011039 on Pompano Beach Click2Gov: “NEW SFR”

Nearby

More new homes nearby

All 78 in Blanche Ely →

Also close by: 1451 NW 7 Way · 1410 NW 7 Way · 1450 NW 7 Way · 1420 NW 7 Way · 1421 NW 7 Ter · 1451 NW 7 Ter