Sold
Sold: a recorded sale of the finished home
Likely spec
Likely spec: the owner on the permit has sold 1 other new home. Not confirmed by the builder.
2321 NW 4 St
Drag to compare the lot in 2020 with January 2026. The pink line is the surveyed parcel boundary.
Where it stands
Last city record Apr 11, 2023PermitMay ’21
FoundationJun ’22
VerticalAug ’22
FinishSep ’22
COApr ’23
DoneApr ’23
Sold$575K · Apr 2023$249 per sq ft
The numbers
From deeds, the permit and the parcel roll- Lot purchase
- $44K Feb 2020
- Lot size
- 5,151 sf 0.12 acres
- Declared permit value
- $180K as declared; real cost runs well higher
- Home size
- 2,312 sf on the tax roll
- Plan
- Not in the permit
- Flood zone
- AH base flood elevation 12 ft
- Waterfront
- No
- Ownership
- Private owner likely spec: the owner on the permit has sold 1 other new home
Against the market
Pompano Beach · since 2021Build time, months from permit
0 mo30 mo60 mo
Built in 23.2 months, 5.1 months slower than typical (18.1 months for homes off the water in Pompano Beach).
Lot price vs. new-build lots in Old Collier
$0$100K$200K
This lot cost $44K. The median new-build lot in Old Collier went for $111K (24 lots).
- This home
Middle half, Pompano Beach off the water
144 homes off the water in Pompano Beach permitted 2021–2023, from the permit application to the certificate-of-occupancy packet.
- Median
Construction log
41 city records- Zoning finalApproved
- Miscellaneous finalApproved
- Roofing finalApproved
- Fence/wall finalApproved
- Building finalApproved
- Plumbing final water meter & b/fApproved
- Final-plumbingApproved
- Final-mechanicalApproved
- Landscape shrub/sod/groundcoverApproved
- Landscape planting inspectionApproved
- Landscape irrigation wet testApproved
- Final landscapeApproved
- Plumbing lawn sprinklerApproved
- Engineering paver block final inspectionApproved
- Electrical final-electricApproved
- Electrical 30 day temporary powerApproved
- Engineering paver limerock base insp.Approved
- Engineering paving conc. form/steel inspApproved
- Drywall-screw/nailApproved
- Finishes: insulation certifiedInsulation-walls · Approved
- FramingApproved
- Electrical roughApproved
- Mechanical roughApproved
- Electrical service roughPartially approved
- Plumbing top outApproved
- LathApproved
- Roof: truss drawings filedTruss · Approved
- Roof sheathingApproved
- Tie beamsCancelled
- Windows/doorsApproved
- Finishes: insulation certifiedInsulation-ceilings · Approved
- Columns/shear wallApproved
- BeamsApproved
- Window/door framingApproved
- Tin tagApproved
- Tile/shingle-in progressApproved
- Slab/reinforcingApproved
- FootingsApproved
- Electrical foundation groundApproved
- Plumbing roughApproved
- New-home permit filedResidential New Construction Permit · CO issued
Permit 21-00003914 on Pompano Beach Click2Gov: “NEW DUPLEX”
Nearby
All 97 in Old Collier →More new homes nearby
Sold
2341 NW 4 St
Old CollierDuplexBest Building Concepts
Permit
Foundation
Vertical
Finish
CO
Done
Lot bought$44K
Home2,312 sf
Sold$575K
Sold
2373 NW 3 St
Old CollierWright Now Construction
Permit
Foundation
Vertical
Finish
CO
Done
Lot bought$89K
Home1,708 sf
Sold$505K
Filed
2251 NW 4 Ct
Old CollierPreferred General Contractors
Permit
Foundation
Vertical
Finish
CO
Done
Lot bought$80K
Plan~1,386 sf
Est. doneDec ’27–Oct ’28
Also close by: 2341 NW 2 St · 2143 NW 4 St · 2430 NW 4 Ct · 2350 NW 2 St · 2140 NW 5 St · 2151 NW 5 St