Townhomes

Townhomes: 3+ attached homes, each on its own lot

415–427 NE 2 Ave

Flagler Village, Fort LauderdaleBuilt by Construction & Consulting Contractors4 townhomes · 4 bd · 4.5 ba · 3 story · 2-car garage
415–427 NE 2 Ave in January 2026415–427 NE 2 Ave in January 20252025 · Broward County · Broward Co.2026 · Broward County · Broward Co.

Drag to compare the site in January 2025 with January 2026. Pink lines are the unit lots, one per home.

Where it stands

Last city record Oct 14, 2026

2 of 4 units have reached finishes. Dates are when the first unit reached each stage; counts are units.

Estimated completionDec 2026 – Feb 2027From the first unit permit and the middle half of townhome build times (51 units, median 23 months). An estimate, not the builder’s commitment.

The numbers

From deeds, the permits and the parcel roll
Units
4 townhomes 4 unit lots on the roll · 4 unit permits
Plan
4 bd · 4.5 ba · 3 story · 2-car garage
Unit size
Not on the tax roll yet
New-unit sales
None recorded yet
Price per sq ft
No sales yet
Selling pace
No sales yet
Land purchase
$4.05M 6 parcels · Oct 2021 · about $1.01M per unit
Declared permit value
$1.34M $320K per unit · as declared; real cost runs well higher
Ownership
Fee simple each unit on its own lot, sold separately
Waterfront
No
Unit by unit

4 townhomes, each on its own lot

UnitStatusFirst sale$/sfBeds / bathsSq ftLot sfResales
415 NE 2 AveBLD-RNC-25010110Finishes————3,187—
417 NE 2 AveBLD-RNC-25010211Finishes————3,187—
425 NE 2 AveBLD-RNC-25100541Permitted————3,188—
427 NE 2 AveBLD-RNC-25110023Permitted————3,188—

Sq ft is the tax roll’s adjusted area, close to under air; $/sf uses it. A sale is the unit’s first arms-length sale after it was built; later ones are resales. Each address opens its lot report.

The permits

City of Fort Lauderdale · LauderBuild
Site-work master
Not on record
Site plan (DRC)
Not on record
Unit permits
4 one per unit, or one per two-family building
Declared value per unit
$320K median · $1.34M in total
All 4 unit permits

BLD-RNC-25010110 · BLD-RNC-25010211 · BLD-RNC-25100541 · BLD-RNC-25110023

What the builder declared on the permit. Real construction cost usually runs well higher. Townhome permits declare each unit separately, so the total is the sum of the unit permits.

Construction log

14 city records
  1. Finishes: final survey filedUnits 415, 417 · Final Survey
  2. Foundation: spot survey filedUnit 417 · Spot Survey
  3. Foundation: elevation certificate filedUnit 417 · Under Construction EC
  4. Roof: truss drawings filedUnit 417 · Truss Layout Plan
  5. Foundation: elevation certificate filedUnit 415 · Under Construction EC
  6. Foundation: spot survey filedUnit 415 · Spot Survey
  7. New-home permit filedUnit 427 · Residential New Construction Permit
  8. New-home permit filedUnit 425 · Residential New Construction Permit
  9. Roof: truss drawings filedUnit 415 · Truss Drawings
  10. Engineer's field report filedUnit 415 · Engineering Field Reports (Non-Threshold Buildings)
  11. Foundation: soil and pile report filedUnit 417 · Soil Bearing Capacity Certification with Density Report or Pile Log
  12. New-home permit filedUnit 417 · Residential New Construction Permit
  13. New-home permit filedUnit 415 · Residential New Construction Permit