Complete

Complete: certificate-of-occupancy packet submitted, or on the tax roll as a built home

Likely spec

Likely spec: owned by a company named for the builder. Not confirmed by the builder.

1836 NW 6 Pl

1836 NW 6 Pl in January 20261836 NW 6 Pl in January 20252025 · Broward County · Broward Co.2026 · Broward County · Broward Co.

Drag to compare the lot in January 2025 with January 2026. The pink line is the surveyed parcel boundary.

Where it stands

Last city record Nov 25, 2025
CompletedNov 2025Sales on record through Jun 2026

The numbers

From deeds, the permit and the parcel roll
Lot purchase
Part of a $1.48M purchase of 64 lots, Oct 2023
Lot size
4,050 sf 0.09 acres
Declared permit value
$316K as declared; real cost runs well higher
Home size
~3,303 sf from the permit’s plans
Plan
Not in the permit
Flood zone
X
Waterfront
No
Ownership
Company-owned lot likely spec: owned by a company named for the builder

Against the market

Pompano Beach · since 2021
Build time, months from permit
0 mo30 mo60 mo

Built in 7.6 months, 10.5 months faster than typical (18.1 months for homes off the water in Pompano Beach).

  • This home
  • Middle half, Pompano Beach off the water

    144 homes off the water in Pompano Beach permitted 2021–2023, from the permit application to the certificate-of-occupancy packet.

  • Median
How we calculate this

Construction log

51 city records
  1. Zoning finalApproved
  2. Tin tagApproved
  3. Tile/shingle-in progressApproved
  4. Shutter final inspectionApproved
  5. New roof finalApproved
  6. Mechanical roughApproved
  7. Final-mechanicalApproved
  8. Final landscapeApproved
  9. Fenestration finalApproved
  10. Fence/wall finalApproved
  11. Building finalApproved
  12. Addition finalApproved
  13. Electrical final-electricApproved
  14. Miscellaneous finalApproved
  15. FootingsWaived
  16. Final-plumbingApproved
  17. Engineering paver limerock base insp.Approved
  18. Engineering paver block final inspectionApproved
  19. Electrical final-electricApproved
  20. In-prog equipment elevationApproved
  21. In-prog elevation certificateApproved
  22. In-prog boundry surveyApproved
  23. Finished elevation certificateApproved
  24. Final floodplainApproved
  25. Final boundary/topo surveyApproved
  26. Plumbing lawn sprinklerApproved
  27. Final-plumbingApproved
  28. New roof finalApproved
  29. Electrical 30 day temporary powerApproved
  30. Tin tagApproved
  31. Tile/shingle-in progressApproved
  32. Soil treatmentApproved
  33. Soil compactionApproved
  34. Finishes: insulation certifiedInsulation-ceilings · Approved
  35. Floor/deck/dock framingApproved
  36. Columns/shear wallApproved
  37. Plumbing roughApproved
  38. Drywall-screw/nailApproved
  39. Finishes: insulation certifiedInsulation-walls · Approved
  40. LathApproved
  41. FramingApproved
  42. Electrical roughApproved
  43. Plumbing top outApproved
  44. Electrical roughApproved
  45. Windows/doorsApproved
  46. Roof: truss drawings filedTruss · Approved
  47. Roof sheathingApproved
  48. Tie beamsApproved
  49. Slab/reinforcingApproved
  50. Electrical foundation groundApproved
  51. New-home permit filedResidential New Construction Permit · CO issued

Permit 25-00002873 on Pompano Beach Click2Gov: “NEW TWO STRY SFR 5/3 - NEW SFR 5/3”

Nearby

More new homes nearby

All 97 in Old Collier →

Also close by: 1848 NW 6 Pl · 1837 NW 6 Pl · 1843 NW 6 Pl · 1825 NW 6 Pl · 1831 NW 6 Pl · 631 NW 18 Ter