Complete
Complete: certificate-of-occupancy packet submitted, or on the tax roll as a built home
Likely spec
Likely spec: owned by a company named for the builder. Not confirmed by the builder.
651 NW 18 Ter
Aerial from January 2026. The lot looked much the same in January 2025. The pink line is the surveyed parcel boundary.
Where it stands
Last city record Jun 24, 2026PermitJun ’25
FoundationMar ’26
VerticalMay ’26
FinishMay ’26
COJun ’26
DoneJun ’26
CompletedJun 2026Sales on record through Jun 2026
The numbers
From deeds, the permit and the parcel roll- Lot purchase
- Part of a $1.48M purchase of 64 lots, Oct 2023
- Lot size
- 4,058 sf 0.09 acres
- Declared permit value
- $411K as declared; real cost runs well higher
- Home size
- ~3,303 sf from the permit’s plans
- Plan
- 2 story
- Flood zone
- X
- Waterfront
- No
- Ownership
- Company-owned lot likely spec: owned by a company named for the builder
Against the market
Pompano Beach · since 2021Build time, months from permit
0 mo30 mo60 mo
Built in 12.2 months, 5.9 months faster than typical (18.1 months for homes off the water in Pompano Beach).
- This home
Middle half, Pompano Beach off the water
144 homes off the water in Pompano Beach permitted 2021–2023, from the permit application to the certificate-of-occupancy packet.
- Median
Construction log
57 city records- New roof finalApproved
- Miscellaneous finalApproved
- In-prog equipment elevationApproved
- In-prog elevation certificateApproved
- In-prog boundry surveyApproved
- Form board surveyApproved
- Finished elevation certificateApproved
- Final-plumbingApproved
- Final floodplainApproved
- Final boundary/topo surveyApproved
- Fenestration finalApproved
- Fence/wall finalApproved
- Engineering paver block final inspectionApproved
- Windows/doorsApproved
- Window/door framingApproved
- Roof: truss drawings filedTruss · Approved
- Tie beamsApproved
- Soil treatmentApproved
- Soil compactionApproved
- Slab/reinforcingApproved
- Shutter final inspectionApproved
- Roof sheathingApproved
- LathApproved
- Finishes: insulation certifiedInsulation-walls · Approved
- Finishes: insulation certifiedInsulation-ceilings · Approved
- FramingApproved
- FootingsApproved
- Columns/shear wallApproved
- Ceiling frame/gridApproved
- Building finalApproved
- Blower door test - certificateApproved
- Addition finalApproved
- Zoning finalApproved
- Final-plumbingApproved
- Final-mechanicalApproved
- Final landscapeApproved
- Electrical final-electricApproved
- Plumbing lawn sprinklerApproved
- Electrical 30 day temporary powerApproved
- Engineering paver limerock base insp.Approved
- Plumbing top outApproved
- Tin tagApproved
- Tile/shingle-in progressApproved
- LathApproved
- FramingApproved
- Drywall-screw/nailApproved
- Mechanical roughApproved
- Electrical service roughApproved
- Electrical roughApproved
- Plumbing roughApproved
- Soil treatmentApproved
- Soil compactionApproved
- Slab/reinforcingApproved
- FootingsApproved
- Electrical slabApproved
- Electrical foundation groundApproved
- New-home permit filedResidential New Construction Permit · CO issued
Permit 25-00004941 on Pompano Beach Click2Gov: “NEW TWO STRY SFR 5/3 - NEW 2 STRY SF”
Nearby
All 97 in Old Collier →More new homes nearby
Complete
1836 NW 6 Pl
Old CollierD R Horton
Permit
Foundation
Vertical
Finish
CO
Done
Lot bought—
Plan~3,303 sf
Declared permit value$316K
Complete
1830 NW 6 Pl
Old CollierD R Horton
Permit
Foundation
Vertical
Finish
CO
Done
Lot bought—
Plan~2,085 sf
Declared permit value$118K
Complete
1842 NW 6 Pl
Old CollierD R Horton
Permit
Foundation
Vertical
Finish
CO
Done
Lot bought—
Plan~3,303 sf
Declared permit value$411K
Also close by: 631 NW 18 Ter · 1848 NW 6 Pl · 1831 NW 6 Ct · 1837 NW 6 Ct · 1843 NW 6 Ct · 650 NW 18 Mnr