Complete
Complete: certificate-of-occupancy packet submitted, or on the tax roll as a built home
Likely spec
Likely spec: owned by a company named for the builder. Not confirmed by the builder.
1842 NW 6 Pl
Drag to compare the lot in January 2025 with January 2026. The pink line is the surveyed parcel boundary.
Where it stands
Last city record Mar 12, 2026PermitApr ’25
FoundationNov ’25
VerticalDec ’25
FinishDec ’25
COMar ’26
DoneMar ’26
CompletedMar 2026Sales on record through Jun 2026
The numbers
From deeds, the permit and the parcel roll- Lot purchase
- Part of a $1.48M purchase of 64 lots, Oct 2023
- Lot size
- 4,050 sf 0.09 acres
- Declared permit value
- $411K as declared; real cost runs well higher
- Home size
- ~3,303 sf from the permit’s plans
- Plan
- 2 story
- Flood zone
- X
- Waterfront
- No
- Ownership
- Company-owned lot likely spec: owned by a company named for the builder
Against the market
Pompano Beach · since 2021Build time, months from permit
0 mo30 mo60 mo
Built in 11.1 months, 7 months faster than typical (18.1 months for homes off the water in Pompano Beach).
- This home
Middle half, Pompano Beach off the water
144 homes off the water in Pompano Beach permitted 2021–2023, from the permit application to the certificate-of-occupancy packet.
- Median
Construction log
55 city records- Windows/doorsApproved
- Roof: truss drawings filedTruss · Approved
- Roof sheathingApproved
- Columns/shear wallApproved
- Building finalApproved
- Final-plumbingApproved
- Zoning finalApproved
- Final landscapeApproved
- Electrical final-electricApproved
- Roof: truss drawings filedTruss · Approved
- Tie beamsApproved
- Soil treatmentApproved
- Soil compactionApproved
- Slab/reinforcingApproved
- Roof sheathingApproved
- Miscellaneous finalApproved
- LathApproved
- FramingApproved
- FootingsApproved
- Final-plumbingApproved
- Final-mechanicalApproved
- Fenestration finalApproved
- Engineering paver limerock base insp.Approved
- Engineering paver block final inspectionApproved
- Columns/shear wallApproved
- Addition finalApproved
- In-prog equipment elevationApproved
- In-prog elevation certificateApproved
- In-prog boundry surveyApproved
- Form board surveyApproved
- Finished elevation certificateApproved
- Final floodplainApproved
- Final boundary/topo surveyApproved
- New roof finalApproved
- Plumbing lawn sprinklerApproved
- Electrical 30 day temporary powerApproved
- Tin tagApproved
- Tile/shingle-in progressApproved
- Drywall-screw/nailApproved
- LathApproved
- Finishes: insulation certifiedInsulation-walls · Approved
- Finishes: insulation certifiedInsulation-ceilings · Approved
- FramingApproved
- Electrical roughApproved
- Plumbing top outApproved
- Mechanical roughApproved
- Tie beamsApproved
- FootingsApproved
- Soil treatmentPartially approved
- Soil compactionPartially approved
- Slab/reinforcingPartially approved
- Electrical slabApproved
- Electrical foundation groundApproved
- Plumbing roughApproved
- New-home permit filedResidential New Construction Permit · CO issued
Permit 25-00002870 on Pompano Beach Click2Gov: “NEW 2 STRY SFR 5/3”
Nearby
All 97 in Old Collier →More new homes nearby
Complete
1836 NW 6 Pl
Old CollierD R Horton
Permit
Foundation
Vertical
Finish
CO
Done
Lot bought—
Plan~3,303 sf
Declared permit value$316K
Complete
1848 NW 6 Pl
Old CollierD R Horton
Permit
Foundation
Vertical
Finish
CO
Done
Lot bought—
Plan~2,499 sf
Declared permit value$131K
Complete
651 NW 18 Ter
Old CollierD R Horton
Permit
Foundation
Vertical
Finish
CO
Done
Lot bought—
Plan~3,303 sf
Declared permit value$411K
Also close by: 1830 NW 6 Pl · 1843 NW 6 Pl · 1849 NW 6 Pl · 1837 NW 6 Pl · 1831 NW 6 Pl · 650 NW 18 Mnr