Complete
Complete: certificate-of-occupancy packet submitted, or on the tax roll as a built home
Likely spec
Likely spec: owned by a company named for the builder. Not confirmed by the builder.
1866 NW 6 Ct
Drag to compare the lot in January 2025 with January 2026. The pink line is the surveyed parcel boundary.
Where it stands
Last city record Apr 30, 2026PermitJun ’25
FoundationJan ’26
VerticalJan ’26
FinishFeb ’26
COApr ’26
DoneApr ’26
CompletedApr 2026Sales on record through Jun 2026
The numbers
From deeds, the permit and the parcel roll- Lot purchase
- Part of a $1.48M purchase of 64 lots, Oct 2023
- Lot size
- 4,500 sf 0.10 acres
- Declared permit value
- $284K as declared; real cost runs well higher
- Home size
- ~1,739 sf from the permit’s plans
- Plan
- Not in the permit
- Flood zone
- AH base flood elevation 11 ft
- Waterfront
- No
- Ownership
- Company-owned lot likely spec: owned by a company named for the builder
Against the market
Pompano Beach · since 2021Build time, months from permit
0 mo30 mo60 mo
Built in 10.4 months, 7.7 months faster than typical (18.1 months for homes off the water in Pompano Beach).
- This home
Middle half, Pompano Beach off the water
144 homes off the water in Pompano Beach permitted 2021–2023, from the permit application to the certificate-of-occupancy packet.
- Median
Construction log
48 city records- Zoning finalApproved
- Elevation surveyApproved
- Building finalApproved
- Final-mechanicalApproved
- Final landscapeApproved
- Weather flashingApproved
- Shutter final inspectionApproved
- Miscellaneous finalApproved
- Finishes: insulation certifiedInsulation-ceilings · Approved
- Final-plumbingApproved
- Electrical service roughApproved
- Electrical final-electricApproved
- Ceiling frame/gridApproved
- Blower door test - certificateApproved
- In-prog equipment elevationApproved
- In-prog elevation certificateApproved
- Finished elevation certificateApproved
- Final floodplainApproved
- Final boundary/topo surveyApproved
- Engineering paver block final inspectionApproved
- New roof finalApproved
- Engineering paver limerock base insp.Approved
- Electrical 30 day temporary powerApproved
- Tin tagApproved
- Tile/shingle-in progressApproved
- Drywall-screw/nailApproved
- LathApproved
- Finishes: insulation certifiedInsulation-walls · Approved
- FurringApproved
- FramingApproved
- Plumbing top outApproved
- Plumbing roughApproved
- Electrical roughApproved
- Mechanical roughApproved
- Windows/doorsApproved
- Roof sheathingApproved
- Roof: truss drawings filedTruss · Approved
- Tie beamsApproved
- Soil treatmentApproved
- Soil compactionApproved
- Slab/reinforcingApproved
- FootingsApproved
- Columns/shear wallApproved
- BeamsApproved
- In-prog boundry surveyApproved
- Electrical underground wiring/pipingApproved
- Electrical foundation groundApproved
- New-home permit filedResidential New Construction Permit · CO issued
Permit 25-00004929 on Pompano Beach Click2Gov: “NEW SFR”
Nearby
All 97 in Old Collier →More new homes nearby
Complete
1872 NW 6 Ct
Old CollierD R Horton
Permit
Foundation
Vertical
Finish
CO
Done
Lot bought—
Plan~1,739 sf
Declared permit value$271K
Complete
1860 NW 6 Ct
Old CollierD R Horton
Permit
Foundation
Vertical
Finish
CO
Done
Lot bought—
Plan~1,739 sf
Declared permit value$258K
Complete
1854 NW 6 Ct
Old CollierD R Horton
Permit
Foundation
Vertical
Finish
CO
Done
Lot bought—
Plan~2,558 sf
Declared permit value$323K