Where it stands

Last city record Oct 27, 2026
Estimated completionJan–Apr 2027From the permit date, with the middle half of build times for homes off the water. An estimate, not the builder’s commitment.

The numbers

From deeds, the permit and the parcel roll
Lot purchase
Part of a $1.48M purchase of 64 lots, Oct 2023
Lot size
4,593 sf 0.11 acres
Declared permit value
$375K as declared; real cost runs well higher
Home size
~3,018 sf from the permit’s plans
Plan
Not in the permit
Flood zone
AH base flood elevation 11 ft
Waterfront
No
Ownership
Company-owned lot likely spec: owned by a company named for the builder

Against the market

Pompano Beach · since 2021
Build time, months from permit
0 mo30 mo60 mo

16.4 months since the permit. A typical home off the water in Pompano Beach takes 18.1; the middle half take 13.3–23.7.

  • This home
  • Middle half, Pompano Beach off the water

    144 homes off the water in Pompano Beach permitted 2021–2023, from the permit application to the certificate-of-occupancy packet.

  • Median
How we calculate this

Construction log

47 city records
  1. Zoning finalDisapproved
  2. Building finalDisapproved
  3. Final landscapeApproved
  4. Windows/doorsApproved
  5. Weather flashingApproved
  6. Roof: truss drawings filedTruss · Approved
  7. Tin tagApproved
  8. Tile/shingle-in progressApproved
  9. Tie beamsApproved
  10. Soil treatmentApproved
  11. Soil compactionApproved
  12. Slab/reinforcingApproved
  13. Roof sheathingApproved
  14. New roof finalApproved
  15. Miscellaneous finalApproved
  16. LathApproved
  17. Finishes: insulation certifiedInsulation-walls · Approved
  18. Finishes: insulation certifiedInsulation-ceilings · Approved
  19. FurringApproved
  20. FramingApproved
  21. FootingsApproved
  22. Floor/deck/dock framingApproved
  23. Final-plumbingApproved
  24. Drywall-screw/nailApproved
  25. Columns/shear wallApproved
  26. Ceiling frame/gridApproved
  27. Blower door test - certificateApproved
  28. BeamsApproved
  29. Plumbing lawn sprinklerApproved
  30. Final-plumbingApproved
  31. Final-mechanicalApproved
  32. Final floodplainApproved
  33. Engineering paver limerock base insp.Approved
  34. Engineering paver block final inspectionApproved
  35. Electrical underground wiring/pipingApproved
  36. Electrical service roughApproved
  37. Electrical final-electricApproved
  38. In-prog equipment elevationApproved
  39. In-prog elevation certificateApproved
  40. In-prog boundry surveyApproved
  41. Finished elevation certificateApproved
  42. Final boundary/topo surveyApproved
  43. Electrical 30 day temporary powerApproved
  44. Electrical roughApproved
  45. Mechanical roughApproved
  46. Electrical foundation groundApproved
  47. New-home permit filedResidential New Construction Permit · Issued

Permit 25-00004923 on Pompano Beach Click2Gov: “NEW SFR”

Nearby

More new homes nearby

All 97 in Old Collier →

Also close by: 611 NW 18 Mnr · 1866 NW 6 Ct · 1860 NW 6 Ct · 1872 NW 6 Ct · 1854 NW 6 Ct · 1842 NW 6 Ct