Rising

Rising: permitted and not yet finished, with a live permit (the city extends it at each passed inspection) or city records in the past 90 days

Custom

Custom: a company owns the lot, but nothing on record says it’s being built to sell.

1915 NE 7 Ct

1915 NE 7 Ct in January 20261915 NE 7 Ct in January 20252025 · Broward County · Broward Co.2026 · Broward County · Broward Co.

Drag to compare the lot in January 2025 with January 2026. The pink line is the surveyed parcel boundary.

Where it stands

Last city record Oct 2, 2026
Estimated completionMar 2027 – Mar 2028From the permit date, with the middle half of build times for homes off the water. An estimate, not the builder’s commitment.

The numbers

From deeds, the permit and the parcel roll
Likely to sell for$3.05–3.4MOur estimate from the lot’s price and what new homes nearby sold for. Not an appraisal or the builder’s price. How we estimate it
Lot purchase
$975K Jan 2025
Lot size
9,000 sf 0.21 acres
Declared permit value
$485K as declared; real cost runs well higher
Home size
Not yet on the tax roll
Plan
5 bd · 5.5 ba
Flood zone
AE base flood elevation 7 ft
Waterfront
No
Ownership
Company-owned lot likely a custom home

Against the market

Fort Lauderdale · since 2021
Build time, months from permit
0 mo30 mo60 mo

15.5 months since the permit. A typical home off the water in Fort Lauderdale takes 24.4; the middle half take 18.7–31.2.

Lot price vs. new-build lots in Victoria Park
$0$1.43M$2.86M

This lot cost $975K. The median new-build lot in Victoria Park went for $850K (111 lots).

  • This home
  • Middle half, Fort Lauderdale off the water

    80 homes off the water in Fort Lauderdale permitted 2021–2023, from the permit application to the certificate-of-occupancy packet.

  • Median
How we calculate this

Construction log

23 city records
  1. NOA / Product ApprovalComplete
  2. Plan RevisionComplete
  3. Plan RevisionWithdrawn
  4. NOA / Product ApprovalComplete
  5. Walls: block-wall inspection letter filedConcrete Masonry Unit (CMU) Letter · Complete
  6. MiscellaneousVoid
  7. Plan RevisionComplete
  8. Roof: truss drawings filedTruss Drawings · Complete
  9. Plan RevisionComplete
  10. Foundation: elevation certificate filedUnder Construction EC · Complete
  11. Foundation: spot survey filedSpot Survey · Complete
  12. Architect LetterComplete
  13. Foundation: soil and pile report filedSoil Bearing Capacity Certification with Density Report or Pile Log · Void
  14. Plan RevisionComplete
  15. Foundation: spot survey filedSpot Survey · Complete
  16. Miscellaneous PermitVoid
  17. MiscellaneousVoid
  18. Driveway and paving permitPaving Permit · Issued
  19. Pool permitPool-Spa-Fountain Permit · Issued
  20. Driveway and paving permitPaving Permit · Issued
  21. Fence PermitIssued
  22. Demolition permitDemolition Permit · In Review
  23. New-home permit filedResidential New Construction Permit · Issued

Permit BLD-RNC-25070586 on LauderBuild: “NEW SFR New construction of SFR 5 bedrooms and 5.5 bathrooms.”

Nearby

More new homes nearby

All 119 in Victoria Park →

Also close by: 714 NE 18 Ave · 709 NE 18 Ave · 643 NE 18 Ave · 719 N Victoria Park Rd · 729 N Victoria Park Rd · 739 N Victoria Park Rd