Complete

Complete: certificate-of-occupancy packet submitted, or on the tax roll as a built home

Likely spec

Likely spec: owned by a company named for the builder. Not confirmed by the builder.

651 NW 18 Mnr

651 NW 18 Mnr in January 2026651 NW 18 Mnr in January 20252025 · Broward County · Broward Co.2026 · Broward County · Broward Co.

Drag to compare the lot in January 2025 with January 2026. The pink line is the surveyed parcel boundary.

Where it stands

Last city record Mar 10, 2026
CompletedMar 2026Sales on record through Jun 2026

The numbers

From deeds, the permit and the parcel roll
Lot purchase
Part of a $1.48M purchase of 64 lots, Oct 2023
Lot size
4,500 sf 0.10 acres
Declared permit value
$271K as declared; real cost runs well higher
Home size
~2,046 sf from the permit’s plans
Plan
Not in the permit
Flood zone
X base flood elevation 11 ft
Waterfront
No
Ownership
Company-owned lot likely spec: owned by a company named for the builder

Against the market

Pompano Beach · since 2021
Build time, months from permit
0 mo30 mo60 mo

Built in 9.2 months, 8.9 months faster than typical (18.1 months for homes off the water in Pompano Beach).

  • This home
  • Middle half, Pompano Beach off the water

    144 homes off the water in Pompano Beach permitted 2021–2023, from the permit application to the certificate-of-occupancy packet.

  • Median
How we calculate this

Construction log

45 city records
  1. Final-plumbingApproved
  2. Building finalApproved
  3. Zoning finalApproved
  4. Final landscapeApproved
  5. Electrical final-electricApproved
  6. Windows/doorsApproved
  7. Mechanical roughApproved
  8. Final-mechanicalApproved
  9. Roof sheathingApproved
  10. Finishes: insulation certifiedInsulation-ceilings · Approved
  11. FurringApproved
  12. Floor/deck/dock framingApproved
  13. BeamsApproved
  14. In-prog equipment elevationApproved
  15. In-prog boundry surveyApproved
  16. Finished elevation certificateApproved
  17. Final floodplainApproved
  18. Final boundary/topo surveyApproved
  19. Miscellaneous finalApproved
  20. Engineering paver block final inspectionApproved
  21. New roof finalApproved
  22. Final-plumbingApproved
  23. Plumbing lawn sprinklerApproved
  24. Electrical service roughApproved
  25. Electrical final-electricApproved
  26. Engineering paver limerock base insp.Approved
  27. Electrical 30 day temporary powerApproved
  28. Tile/shingle-in progressApproved
  29. Drywall-screw/nailApproved
  30. LathApproved
  31. Tin tagCancelled
  32. Finishes: insulation certifiedInsulation-walls · Approved
  33. FramingApproved
  34. Plumbing top outApproved
  35. Electrical roughApproved
  36. Soil compactionApproved
  37. Roof: truss drawings filedTruss · Approved
  38. In-prog elevation certificateApproved
  39. Columns/shear wallApproved
  40. Soil treatmentApproved
  41. Slab/reinforcingApproved
  42. Electrical underground wiring/pipingApproved
  43. Electrical foundation groundApproved
  44. Plumbing roughApproved
  45. New-home permit filedResidential New Construction Permit · CO issued

Permit 25-00004429 on Pompano Beach Click2Gov: “NEW SFR”

Nearby

More new homes nearby

All 97 in Old Collier →

Also close by: 631 NW 18 Mnr · 660 NW 18 Mnr · 670 NW 18 Mnr · 621 NW 18 Mnr · 650 NW 18 Mnr · 611 NW 18 Mnr