Complete

Complete: certificate-of-occupancy packet submitted, or on the tax roll as a built home

Likely spec

Likely spec: owned by a company named for the builder. Not confirmed by the builder.

650 NW 18 Mnr

Aerial of 650 NW 18 Mnr, January 20262026 · Broward County · Broward Co.

Aerial from January 2026, the newest available. The pink line is the surveyed parcel boundary.

Where it stands

Last city record Dec 11, 2025
CompletedDec 2025Sales on record through Jun 2026

The numbers

From deeds, the permit and the parcel roll
Lot purchase
Part of a $1.48M purchase of 64 lots, Oct 2023
Lot size
4,050 sf 0.09 acres
Declared permit value
$381K as declared; real cost runs well higher
Home size
~3,018 sf from the permit’s plans
Plan
Not in the permit
Flood zone
AH base flood elevation 11 ft
Waterfront
No
Ownership
Company-owned lot likely spec: owned by a company named for the builder

Against the market

Pompano Beach · since 2021
Build time, months from permit
0 mo30 mo60 mo

Built in 7.3 months, 10.8 months faster than typical (18.1 months for homes off the water in Pompano Beach).

  • This home
  • Middle half, Pompano Beach off the water

    144 homes off the water in Pompano Beach permitted 2021–2023, from the permit application to the certificate-of-occupancy packet.

  • Median
How we calculate this

Construction log

52 city records
  1. Fenestration finalApproved
  2. Zoning finalApproved
  3. Windows/doorsApproved
  4. Shutter final inspectionApproved
  5. Building finalApproved
  6. Final-plumbingApproved
  7. Final landscapeApproved
  8. Roof: truss drawings filedTruss · Approved
  9. Tie beamsApproved
  10. Soil treatmentApproved
  11. Soil compactionApproved
  12. Slab/reinforcingApproved
  13. Roof sheathingApproved
  14. Plumbing lawn sprinklerApproved
  15. Miscellaneous finalApproved
  16. LathApproved
  17. In-prog equipment elevationApproved
  18. In-prog elevation certificateApproved
  19. In-prog boundry surveyApproved
  20. FramingApproved
  21. FootingsWaived
  22. Finished elevation certificateApproved
  23. Final-plumbingApproved
  24. Final-mechanicalApproved
  25. Final floodplainApproved
  26. Final boundary/topo surveyApproved
  27. Engineering paver limerock base insp.Approved
  28. Engineering paver block final inspectionApproved
  29. Electrical underground wiring/pipingApproved
  30. Electrical service roughApproved
  31. Electrical roughApproved
  32. Electrical final-electricApproved
  33. Columns/shear wallApproved
  34. Addition finalApproved
  35. Electrical 30 day temporary powerApproved
  36. New roof finalApproved
  37. Tin tagApproved
  38. Tile/shingle-in progressApproved
  39. Drywall-screw/nailApproved
  40. Finishes: insulation certifiedInsulation-walls · Approved
  41. Finishes: insulation certifiedInsulation-ceilings · Approved
  42. FramingApproved
  43. Electrical roughApproved
  44. Plumbing top outApproved
  45. Plumbing roughApproved
  46. Mechanical roughApproved
  47. Roof: truss drawings filedTruss · Approved
  48. Roof sheathingApproved
  49. Tie beamsApproved
  50. Slab/reinforcingApproved
  51. Electrical foundation groundApproved
  52. New-home permit filedResidential New Construction Permit · CO issued

Permit 25-00003573 on Pompano Beach Click2Gov: “NEW TWO STRY SFR 4/3”

Nearby

More new homes nearby

All 97 in Old Collier →

Also close by: 1848 NW 6 Pl · 641 NW 18 Mnr · 670 NW 18 Mnr · 671 NW 18 Mnr · 1849 NW 6 Ct · 610 NW 18 Mnr