Rising

Rising: units under construction, with city activity in the past 12 months

Villa pair

Villa pair: two attached homes sold separately, each on its own lot

214–216 SW 9 St

Tarpon River, Fort LauderdaleBuilt by Hausbau ConstructionVilla pair · 4 bd · 4.5 ba · 2 story · 1-car garage
214–216 SW 9 St in January 2026214–216 SW 9 St in January 20242024 · Broward County · Broward Co.2026 · Broward County · Broward Co.

Drag to compare the site in January 2024 with January 2026. Pink lines are the unit lots, one per home.

Where it stands

Last city record Nov 4, 2026

2 of 2 units have reached going vertical. Dates are when the first unit reached each stage; counts are units.

Estimated completionMar–Jul 2027From the first unit permit and the middle half of villa-pair build times (41 units, median 23.7 months). An estimate, not the builder’s commitment.

The numbers

From deeds, the permits and the parcel roll
Units
2 villas 2 unit lots on the roll · 2 unit permits
Plan
4 bd · 4.5 ba · 2 story · 1-car garage
Unit size
Not on the tax roll yet
New-unit sales
None recorded yet
Price per sq ft
No sales yet
Selling pace
No sales yet
Land purchase
$490K 2 parcels · May 2024 · about $245K per unit
Declared permit value
$800K $400K per unit · as declared; real cost runs well higher
Ownership
Fee simple each unit on its own lot, sold separately
Waterfront
No
Unit by unit

2 villas, each on its own lot

UnitStatusFirst sale$/sfBeds / bathsSq ftLot sfResales
214 SW 9 StBLD-RNC-24110130Going vertical————3,325—
216 SW 9 StBLD-RNC-24110141Going vertical————3,323—

Sq ft is the tax roll’s adjusted area, close to under air; $/sf uses it. A sale is the unit’s first arms-length sale after it was built; later ones are resales. Each address opens its lot report.

The permits

City of Fort Lauderdale · LauderBuild
Site-work master
Not on record
Site plan (DRC)
Not on record
Unit permits
2 one per unit, or one per two-family building
Declared value per unit
$400K median · $800K in total
All 2 unit permits

BLD-RNC-24110130 · BLD-RNC-24110141

What the builder declared on the permit. Real construction cost usually runs well higher. Townhome permits declare each unit separately, so the total is the sum of the unit permits.

Construction log

11 city records
  1. Engineer's field report filedUnits 214, 216 · Engineering Field Reports (Non-Threshold Buildings)
  2. Walls: block-wall inspection letter filedUnits 214, 216 · Concrete Masonry Unit (CMU) Letter
  3. Foundation: spot survey filedUnits 214, 216 · Spot Survey
  4. Roof: truss drawings filedUnits 214, 216 · Truss Drawings
  5. Engineer's field report filedUnit 214 · Engineering Field Reports (Non-Threshold Buildings)
  6. New-home permit filedUnits 214, 216 · Residential New Construction Permit
Nearby

More townhomes in Tarpon River

All townhome projects →