Rising

Rising: units under construction, with city activity in the past 12 months

Villa pair

Villa pair: two attached homes sold separately, each on its own lot

218–220 SW 10 St

Tarpon River, Fort LauderdaleBuilt by GC ProVilla pair · 3 bd · 2.5 ba · 2 story · 1-car garage
218–220 SW 10 St in January 2026218–220 SW 10 St in January 20252025 · Broward County · Broward Co.2026 · Broward County · Broward Co.

Drag to compare the site in January 2025 with January 2026. Pink lines are the unit lots, one per home.

Where it stands

Last city record Oct 19, 2026

2 of 2 units have reached finishes. Dates are when the first unit reached each stage; counts are units.

Estimated completionApr 2027 – Jun 2028From the first unit permit and the middle half of villa-pair build times (41 units, median 23.7 months). An estimate, not the builder’s commitment.

The numbers

From deeds, the permits and the parcel roll
Units
2 villas 2 unit lots on the roll · 2 unit permits
Plan
3 bd · 2.5 ba · 2 story · 1-car garage
Unit size
Not on the tax roll yet
New-unit sales
None recorded yet
Price per sq ft
No sales yet
Selling pace
No sales yet
Land purchase
Not recorded
Declared permit value
$290K $145K per unit · as declared; real cost runs well higher
Ownership
Fee simple each unit on its own lot, sold separately
Waterfront
No
Unit by unit

2 villas, each on its own lot

UnitStatusFirst sale$/sfBeds / bathsSq ftLot sfResales
218 SW 10 StBLD-RNC-25090631Finishes————3,125—
220 SW 10 StBLD-RNC-25100586Finishes————3,125—

Sq ft is the tax roll’s adjusted area, close to under air; $/sf uses it. A sale is the unit’s first arms-length sale after it was built; later ones are resales. Each address opens its lot report.

The permits

City of Fort Lauderdale · LauderBuild
Site-work master
Not on record
Site plan (DRC)
Not on record
Unit permits
2 one per unit, or one per two-family building
Declared value per unit
$145K median · $290K in total
All 2 unit permits

BLD-RNC-25090631 · BLD-RNC-25100586

What the builder declared on the permit. Real construction cost usually runs well higher. Townhome permits declare each unit separately, so the total is the sum of the unit permits.

Construction log

12 city records
  1. Finishes: insulation certifiedUnits 218, 220 · Certificate of Insulation
  2. Walls: block-wall inspection letter filedUnits 218, 220 · Concrete Masonry Unit (CMU) Letter
  3. Roof: truss drawings filedUnits 218, 220 · Truss Layout Plan
  4. Walls: block-wall inspection letter filedUnit 218 · Concrete Masonry Unit (CMU) Letter
  5. Walls: block-wall inspection letter filedUnit 220 · Concrete Masonry Unit (CMU) Letter
  6. Foundation: spot survey filedUnits 218, 220 · Spot Survey
  7. New-home permit filedUnit 220 · Residential New Construction Permit
  8. New-home permit filedUnit 218 · Residential New Construction Permit
Nearby

More townhomes in Tarpon River

All townhome projects →