Rising

Rising: units under construction, with city activity in the past 12 months

Villa pair

Villa pair: two attached homes sold separately, each on its own lot

846–848 SW 11 St

Tarpon River, Fort LauderdaleBuilt by Palladium ConstructionVilla pair · 4 bd · 3.5 ba · 2 story · 1-car garage
Aerial of 846–848 SW 11 St with its unit lots outlined, January 20262026 · Broward County · Broward Co.

Aerial from January 2026. The site looked much the same in January 2024. Pink lines are the unit lots, one per home.

Where it stands

Last city record Sep 29, 2026

2 of 2 units have reached going vertical. Dates are when the first unit reached each stage; counts are units.

Estimated completionMar–Jul 2027From the first unit permit and the middle half of villa-pair build times (41 units, median 23.7 months). An estimate, not the builder’s commitment.

The numbers

From deeds, the permits and the parcel roll
Units
2 villas 1 unit lot on the roll · 2 unit permits
Plan
4 bd · 3.5 ba · 2 story · 1-car garage
Unit size
Not on the tax roll yet
New-unit sales
None recorded yet
Price per sq ft
No sales yet
Selling pace
No sales yet
Land purchase
$520K 2 parcels · Sep 2023 · about $260K per unit
Declared permit value
$780K $390K per unit · as declared; real cost runs well higher
Ownership
Fee simple each unit on its own lot, sold separately
Waterfront
No
Unit by unit

2 villas, each on its own lot

UnitStatusFirst sale$/sfBeds / bathsSq ftLot sfResales
846 SW 11 StBLD-RNC-24100660Going vertical————3,450—
848 SW 11 StBLD-RNC-24100716Going vertical——————

Sq ft is the tax roll’s adjusted area, close to under air; $/sf uses it. A sale is the unit’s first arms-length sale after it was built; later ones are resales. Each address opens its lot report.

The permits

City of Fort Lauderdale · LauderBuild
Site-work master
Not on record
Site plan (DRC)
Not on record
Unit permits
2 one per unit, or one per two-family building
Declared value per unit
$390K median · $780K in total
All 2 unit permits

BLD-RNC-24100660 · BLD-RNC-24100716

What the builder declared on the permit. Real construction cost usually runs well higher. Townhome permits declare each unit separately, so the total is the sum of the unit permits.

Construction log

5 city records
  1. Walls: block-wall inspection letter filedUnits 846, 848 · Concrete Masonry Unit (CMU) Letter
  2. Foundation: soil and pile report filedUnit 846 · Soil Bearing Capacity Certification with Density Report or Pile Log
  3. New-home permit filedUnit 848 · Residential New Construction Permit
  4. New-home permit filedUnit 846 · Residential New Construction Permit
Nearby

More townhomes in Tarpon River

All townhome projects →