Complete

Complete: certificate-of-occupancy packet submitted, or on the tax roll as a built home

Likely spec

Likely spec: owned by a company named for the builder. Not confirmed by the builder.

1837 NW 6 Ct

1837 NW 6 Ct in January 20261837 NW 6 Ct in January 20252025 · Broward County · Broward Co.2026 · Broward County · Broward Co.

Drag to compare the lot in January 2025 with January 2026. The pink line is the surveyed parcel boundary.

Where it stands

Last city record Jul 1, 2026
CompletedJun 2026Sales on record through Jun 2026

The numbers

From deeds, the permit and the parcel roll
Lot purchase
Not recorded
Lot size
4,058 sf 0.09 acres
Declared permit value
$309K as declared; real cost runs well higher
Home size
~2,627 sf from the permit’s plans
Plan
Not in the permit
Flood zone
AH base flood elevation 11 ft
Waterfront
No
Ownership
Company-owned lot likely spec: owned by a company named for the builder

Against the market

Pompano Beach · since 2021
Build time, months from permit
0 mo30 mo60 mo

Built in 12.2 months, 5.9 months faster than typical (18.1 months for homes off the water in Pompano Beach).

  • This home
  • Middle half, Pompano Beach off the water

    144 homes off the water in Pompano Beach permitted 2021–2023, from the permit application to the certificate-of-occupancy packet.

  • Median
How we calculate this

Construction log

55 city records
  1. Fenestration finalApproved
  2. Zoning finalApproved
  3. Electrical service roughApproved
  4. Electrical final-electricApproved
  5. Final-mechanicalApproved
  6. Roof: truss drawings filedTruss · Approved
  7. Tie beamsApproved
  8. Soil treatmentApproved
  9. Soil compactionApproved
  10. Slab/reinforcingApproved
  11. Roof sheathingApproved
  12. Plumbing lawn sprinklerApproved
  13. New roof finalApproved
  14. Miscellaneous finalApproved
  15. LathApproved
  16. Finishes: insulation certifiedInsulation-ceilings · Approved
  17. In-prog equipment elevationApproved
  18. In-prog elevation certificateApproved
  19. In-prog boundry surveyApproved
  20. FramingApproved
  21. FootingsApproved
  22. Finished elevation certificateApproved
  23. Final-plumbingApproved
  24. Final floodplainApproved
  25. Final boundary/topo surveyApproved
  26. Engineering paver block final inspectionApproved
  27. Electrical final-electricApproved
  28. Columns/shear wallApproved
  29. Building finalApproved
  30. Blower door test - certificateApproved
  31. Addition finalApproved
  32. Final landscapeApproved
  33. Electrical 30 day temporary powerApproved
  34. Engineering paver limerock base insp.Approved
  35. Plumbing top outApproved
  36. FramingApproved
  37. Tin tagApproved
  38. Tile/shingle-in progressApproved
  39. Drywall-screw/nailApproved
  40. Finishes: insulation certifiedInsulation-walls · Approved
  41. Mechanical roughApproved
  42. Electrical roughApproved
  43. LathApproved
  44. Windows/doorsApproved
  45. Roof: truss drawings filedTruss · Approved
  46. Roof sheathingApproved
  47. Tie beamsApproved
  48. Plumbing roughCancelled
  49. Soil treatmentApproved
  50. Soil compactionApproved
  51. Slab/reinforcingApproved
  52. FootingsApproved
  53. Electrical slabApproved
  54. Electrical foundation groundApproved
  55. New-home permit filedResidential New Construction Permit · CO issued

Permit 25-00004938 on Pompano Beach Click2Gov: “NEW TWO STRY SFR 4/3”