Complete

Complete: certificate-of-occupancy packet submitted, or on the tax roll as a built home

Likely spec

Likely spec: owned by a company named for the builder. Not confirmed by the builder.

1849 NW 6 Ct

Aerial of 1849 NW 6 Ct, January 20262026 · Broward County · Broward Co.

Aerial from January 2026. The lot looked much the same in January 2025. The pink line is the surveyed parcel boundary.

Where it stands

Last city record May 19, 2026
CompletedMay 2026Sales on record through Jun 2026

The numbers

From deeds, the permit and the parcel roll
Lot purchase
Part of a $1.48M purchase of 64 lots, Oct 2023
Lot size
4,050 sf 0.09 acres
Declared permit value
$406K as declared; real cost runs well higher
Home size
~2,720 sf from the permit’s plans
Plan
Not in the permit
Flood zone
AH base flood elevation 11 ft
Waterfront
No
Ownership
Company-owned lot likely spec: owned by a company named for the builder

Against the market

Pompano Beach · since 2021
Build time, months from permit
0 mo30 mo60 mo

Built in 11 months, 7.1 months faster than typical (18.1 months for homes off the water in Pompano Beach).

  • This home
  • Middle half, Pompano Beach off the water

    144 homes off the water in Pompano Beach permitted 2021–2023, from the permit application to the certificate-of-occupancy packet.

  • Median
How we calculate this

Construction log

47 city records
  1. In-prog equipment elevationApproved
  2. In-prog elevation certificateApproved
  3. Finished elevation certificateApproved
  4. Final floodplainApproved
  5. Final boundary/topo surveyApproved
  6. Building finalApproved
  7. Zoning finalApproved
  8. Weather flashingApproved
  9. Tie beamsApproved
  10. Soil treatmentApproved
  11. Soil compactionApproved
  12. Slab/reinforcingApproved
  13. Shutter final inspectionApproved
  14. Miscellaneous finalApproved
  15. Final-plumbingApproved
  16. Final-mechanicalApproved
  17. Final landscapeApproved
  18. Engineering paver block final inspectionApproved
  19. Columns/shear wallApproved
  20. Ceiling frame/gridApproved
  21. Blower door test - certificateApproved
  22. New roof finalApproved
  23. Mechanical roughApproved
  24. Electrical underground wiring/pipingApproved
  25. Electrical service roughApproved
  26. Electrical final-electricApproved
  27. Plumbing lawn sprinklerApproved
  28. Electrical 30 day temporary powerApproved
  29. Tin tagApproved
  30. Tile/shingle-in progressApproved
  31. Drywall-screw/nailApproved
  32. LathApproved
  33. Finishes: insulation certifiedInsulation-walls · Approved
  34. Finishes: insulation certifiedInsulation-ceilings · Approved
  35. FurringApproved
  36. FramingApproved
  37. Plumbing top outApproved
  38. Plumbing roughApproved
  39. Electrical roughApproved
  40. Windows/doorsApproved
  41. Roof: truss drawings filedTruss · Approved
  42. Roof sheathingApproved
  43. Floor/deck/dock framingApproved
  44. In-prog boundry surveyApproved
  45. BeamsApproved
  46. Electrical foundation groundApproved
  47. New-home permit filedResidential New Construction Permit · CO issued

Permit 25-00004940 on Pompano Beach Click2Gov: “NEW SFR”

Nearby

More new homes nearby

All 97 in Old Collier →

Also close by: 610 NW 18 Mnr · 1837 NW 6 Ct · 1842 NW 6 Ct · 1854 NW 6 Ct · 1831 NW 6 Ct · 1860 NW 6 Ct