Rising

Rising: permitted and not yet finished, with a live permit (the city extends it at each passed inspection) or city records in the past 90 days

Likely spec

Likely spec: the owner has sold 1 other new home. Not confirmed by the builder.

1101 SW 8 Ter

Tarpon River, Fort LauderdaleBuilt by Jar Construction5 bd · 5 ba · 2 story · 2-car garage
1101 SW 8 Ter in January 20261101 SW 8 Ter in January 20252025 · Broward County · Broward Co.2026 · Broward County · Broward Co.

Drag to compare the lot in January 2025 with January 2026. The pink line is the surveyed parcel boundary.

Where it stands

Last city record Nov 3, 2026
Estimated completionSep 2027 – Oct 2028From the permit date, with the middle half of build times for homes off the water. An estimate, not the builder’s commitment.

The numbers

From deeds, the permit and the parcel roll
Likely to sell for$1.9–2.65MOur estimate from the lot’s price and what new homes nearby sold for. Not an appraisal or the builder’s price. How we estimate it
Lot purchase
$540K Jul 2025
Lot size
7,807 sf 0.18 acres
Declared permit value
$495K as declared; real cost runs well higher
Home size
Not yet on the tax roll
Plan
5 bd · 5 ba · 2 story
Flood zone
AE base flood elevation 6 ft
Waterfront
No
Ownership
Company-owned lot likely spec: the owner has sold 1 other new home

Against the market

Fort Lauderdale · since 2021
Build time, months from permit
0 mo30 mo60 mo

8.1 months since the permit. A typical home off the water in Fort Lauderdale takes 24.4; the middle half take 18.7–31.2.

Lot price vs. new-build lots in Tarpon River
$0$748K$1.5M

This lot cost $540K. The median new-build lot in Tarpon River went for $500K (39 lots).

  • This home
  • Middle half, Fort Lauderdale off the water

    80 homes off the water in Fort Lauderdale permitted 2021–2023, from the permit application to the certificate-of-occupancy packet.

  • Median
How we calculate this

Construction log

9 city records
  1. Plan RevisionIn Review
  2. Walls: block-wall inspection letter filedConcrete Masonry Unit (CMU) Letter · In Review
  3. Foundation: spot survey filedSpot Survey · Complete
  4. Roof: truss drawings filedTruss Drawings · Complete
  5. Foundation: termite pre-treatment certifiedTermite Treatment Certification · Open
  6. Foundation: soil and pile report filedSoil Bearing Capacity Certification with Density Report or Pile Log · In Review
  7. Foundation: soil and pile report filedSoil Bearing Capacity Certification with Density Report or Pile Log · In Review
  8. New-home permit filedResidential New Construction Permit · Issued
  9. Demolition permitDemolition Permit · Issuance Fees Paid

Permit BLD-RNC-26030158 on LauderBuild: “New Single Family house 2 story 5 bed /5 Bath/2 Car Garage”

Nearby

More new homes nearby

All 47 in Tarpon River →

Also close by: 719 SW 11 St · 1122 SW 8 Ter · 1131 SW 8 Ter · 838 SW 11 Ct · 1130 SW 8 Ter · 837 SW 12 St