Rising

Rising: permitted and not yet finished, with a live permit (the city extends it at each passed inspection) or city records in the past 90 days

Custom

Custom: a company owns the lot, but nothing on record says it’s being built to sell.

1131 SW 8 Ter

Tarpon River, Fort LauderdaleBuilt by Brandcon4 bd · 4.5 ba · 2 story · 2-car garage
Aerial of 1131 SW 8 Ter, January 20262026 · Broward County · Broward Co.

Aerial from January 2026, before work began. The pink line is the surveyed parcel boundary.

Where it stands

Last city record Sep 23, 2026
Estimated completionSep 2027 – Sep 2028From the permit date, with the middle half of build times for homes off the water. An estimate, not the builder’s commitment.

The numbers

From deeds, the permit and the parcel roll
Likely to sell for$1.85–2.55MOur estimate from the lot’s price and what new homes nearby sold for. Not an appraisal or the builder’s price. How we estimate it
Lot purchase
$515K Oct 2025
Lot size
6,200 sf 0.14 acres
Declared permit value
$445K as declared; real cost runs well higher
Home size
Not yet on the tax roll
Plan
4 bd · 4.5 ba · 2 story
Flood zone
AE base flood elevation 6 ft
Waterfront
No
Ownership
Company-owned lot likely a custom home

Against the market

Fort Lauderdale · since 2021
Build time, months from permit
0 mo30 mo60 mo

8.8 months since the permit. A typical home off the water in Fort Lauderdale takes 24.4; the middle half take 18.7–31.2.

Lot price vs. new-build lots in Tarpon River
$0$748K$1.5M

This lot cost $515K. The median new-build lot in Tarpon River went for $500K (39 lots).

  • This home
  • Middle half, Fort Lauderdale off the water

    80 homes off the water in Fort Lauderdale permitted 2021–2023, from the permit application to the certificate-of-occupancy packet.

  • Median
How we calculate this

Construction log

19 city records
  1. Plan RevisionComplete
  2. Roof: truss drawings filedTruss Drawings · In Review
  3. NOA / Product ApprovalComplete
  4. MiscellaneousComplete
  5. Plan RevisionComplete
  6. Roof: truss drawings filedTruss Drawings · Complete
  7. MiscellaneousComplete
  8. MiscellaneousComplete
  9. Walls: block-wall inspection letter filedConcrete Masonry Unit (CMU) Letter · Complete
  10. Foundation: spot survey filedSpot Survey · Complete
  11. Walls: block-wall inspection letter filedConcrete Masonry Unit (CMU) Letter · Complete
  12. Foundation: soil and pile report filedSoil Bearing Capacity Certification with Density Report or Pile Log · Complete
  13. Shop DrawingsComplete
  14. Shop DrawingsComplete
  15. Shop DrawingsComplete
  16. NOA / Product ApprovalComplete
  17. New-home permit filedResidential New Construction Permit · Issued
  18. Driveway and paving permitPaving Permit · Awaiting Initial Fee Payment
  19. Demolition permitDemolition Permit · Awaiting Client Reply

Permit BLD-RNC-26020330 on LauderBuild: “CONSTRUCTION OF NEW 2 STORY SINGLE FAMILY RESIDENCE- 4 BEDROOMS, 4.5 BATHROOMS AND A 2 CAR GARAGE”